dzieci.eu

wersja beta

Prosimy o propozycje i uwagi odnośnie serwisu

Przyłącz się Logowanie

Post

Comparison Of Service Life Before And After Optimization
30 czerwca 202130 czerwca 2021 Dodaj komentarz0 komentarze Bez nazwy Bez nazwy
Through the structural optimization design of the vertical roller mills on both sides of the mine ore bin, the problem of uneven wear and serious wear of the vertical roller mill has been completely solved, and the service life of the optimized vertical roller mill is extended from 6 months to 24 months.

The project has achieved good results, solved the problem of the short service life of the vertical roller mill, reduced the frequency of maintenance and repair of the heavy apron feeder, reduced the labor pressure of the maintenance personnel, and improved the operating efficiency of the equipment and the stability of the production system.

SBM, 35 Years of mining equipment manufacturing, provides types of ore feeders around the world (apron feeder, vibrating feeder, chute feeder, disk feeder, etc).

We are here help to help mining machine selection, mineral processing solutions, processing plant optimization.

TagiTagi:  

komentarze

Dodaj komentarz komentowanie dostępne tylko dla zalogowanych użytkowników

Opis

gjsohcat
Posty: 195
Komentarze: 1
Grinding Mill

Kategorie

Bez nazwy (195)

Tagi

2 jaw (2)
2 crusher (2)
1 barite (1)
3 vertical (3)
2 mill (2)
1 roller (1)
1 mica (1)
aaa
Partnerzy: Szkoła języka niemieckiego Warszawa Sudoku Oferty korepetycji Imiona
Copyright © 2024 www.dzieci.eu
Powered by Dolphin Smart Community Builder   Orca Interactive Forum Script   Ray Community Widget Suite